The Benny Street stormwater outlets are in the news these days. Some 18 months ago the decision was made to clear and excavate about 80 metres of dune area around the outlets, but since then nothing has happened. The area has been flagged off and further work has been halted even though the area is actively eroding and parts of the Boyd Street Erosion Control Area are collapsing into the eroded areas. Writers to Letters-to-the-Editor are blaming local residents for this inaction. Local Council officials, of course, are blaming someone else – this time the State Government for not issuing the necessary approvals for this work on State-owned lands. And the State Government naturally says the delay has nothing to do with them. State Government officers advise that although this work has been on-going for over 18 months, they have only recently been contacted on the matter. So what is happening? In this week’s story, MyBribieIsland tries to determine what has happened to date, why it has happened, what is planned for the future, and what should be planned.

View of outlets, February 16 2012.
(Above) Outlets from beach showing how far the erosion has penetrated into the dunes and beyond into the Boyd Street Erosion Control Area. Sandbags have been piled up against the dune to the north (right of picture) though the worst erosion is probably to the south. (Below left) Pipes in the erosion control area waiting to be installed. They were recently moved back as a result of the ongoing erosion. (Below right) View of ongoing erosion showing the remaining pipes being undermined and collapsing. This situation has been developing now for over 18 months.


So what do these outlets do and who is responsible for them?
The Benny Street storm-water outlets are part of the decades-old underground systems that collect and discharge storm water collected in the Woorim area. These pipes discharge storm water only. All discharges of domestic waste go to the Woorim sewerage treatment plant on First Avenue behind the sporting fields. The Benny Street storm water pipes are owned and maintained by MBRC but they cross coastal land and dunal systems before discharging. In Queensland, all coastal lands (including beaches and the dune systems behind them) are owned by the State Government but they are held in trust by the local councils. Any activity undertaken by a council on State-owned lands must comply with all legislation associated with those coastal lands such as the Coastal Management Act, the Conservation of Migratory Species Act, the Sustainable Management Act and the Aboriginal Cultural Heritage Act. Any major work in those areas (such as work on the storm water pipe discharge) needs State Government approval prior to commencement.


November 2009
What changed after November 2009 and why.
In 2006, in response to major concerns raised by local residents following some significant erosion events during that storm season, Caboolture Shire Council (CSC) commissioned the highly respected international consultants BMT WBM to undertake a study of the causes of the erosion in the Woorim area and to outline a programme to address those causes. Their report is known as the Woorim Beach Shorline Erosion Management Plan (WBSEMP). It was endorsed with no changes or variations by Council in November 2007 and can be found on MBRC’s web site at: http://www.moretonbay.qld.gov.au/general.aspx?id=64971&terms=woorim+beach+shoreline+erosion+management+plan.
One of the major WBSEMP recommendations called for CSC (now part of MBRC) to undertake a sand replenishment programme along the Woorim foreshore to replace sand that had been eroded away. The WBSEMP called for an initial placement of 300,000 cubic metres of sand. The WBSEMP noted that approximately 30,000 cubic metres of sand are eroded from the Woorim coastline each year and the WBSEMP recommended that this amount be replaced each year as an absolute minimum. The WBSEMP made a strong recommendation that this sand be added evenly over the affected area and to avoid placing too much sand in one area to prevent formation of a groyne(s). Unfortunately, this recommendation was not followed and a major portion of the sand was placed immediately in the recreational beach area at Woorim. The WBSEMP predicted that if a groyne were established in this area, then 50 – 80 metres of dune area would be lost on the downstream side as a result of the disruption to the long-shore currents. This prediction has proved to be quite accurate with at least 50 metres of dune being eroded and lost during the 2010 storm season. Prior to this erosion, the Benny Street pipes discharged into Freshwater Creek and from there the storm water made its way to the ocean. Following the 2010 erosion period, the Benny Street pipes were exposed and discharged directly onto the Woorim beach area.


What has been done as a result of the 2010 erosion?
In October 2010, for whatever reason, local Council officials declared that an “emergency” existed at the Benny Street outlets and undertook significant clearing and removal of the dune and the dune vegetation to allow the pipes to be excavated and exposed as shown in the photos below. This work was undertaken without consultation with the relevant State Government authorities and it established a new discharge point further back into the Boyd Street Erosion Control Area. This work destabilized that area and as a consequence it is most prone to erosion. The erosion effects are shown in the photos below in a series of satellite photos from NearMap.






So what is being done now?
If it was just a question of putting the pipes back the way they were, then MBRC could probably proceed with that work immediately. No approvals would be required from the State Government. However, that status-quo solution would be unlikely to be successful as it would probably sand up. In would also fail to meet the best-in-class standards that Council agreed to in November 2011 when it adopted a motion put forward by the Division 1 Councilor.
The modified proposal being considered by Council is to put the pipes back with sandbagging and other erosion proofing under and around the outlets. This represents a variation from the original design of these outlets, and therefore a Development Application is required to be submitted to ensure that the all necessary legislation is being adhered to and that the design is sound from a technical point of view. Further details of this proposal can be found on MBRC’s web site at:
http://pdonline.moretonbay.qld.gov.au/Modules/ApplicationMaster/default.aspx?page=wrapper&key=727924
However from a hydraulic point of view, this modified proposal is essentially the same as the original installation. If it is not best-in-class, why is it being installed at such enormous cost to the ratepayers? Will this solution succeed? Will it sand up as well? Is this the correct solution to pursue?
So what should be done?
The simple answer to the question of what should be done is that MBRC should follow the guidelines that won it the Excellence in Strategic Planning Award at the recent 2011 Stormwater Industry Association of Queensland Awards. This requires that best-in-class guidelines be followed for the engineering, and that affected residents be consulted as outlined in MBRC’s Thinkoutloud guidelines. The Benny Street project has been ongoing now for over 18 months and there has been ample opportunity follow both these guidelines but neither has occurred.
The engineering solution being proposed has its risks. From an engineering point of view, any solution that has storm water discharging below
Highest Astronomical Tide (HAT) runs the chance of sanding up, especially when discharging into the foredune area where sand accumulates in the winter dune-building period. Unfortunately there is insufficient fall available in the Benny Street system to allow the outlet to be lifted above HAT and the proposed solution will exit well below HAT and hence it has a high chance of sanding. One low-risk alternative option would be to install a “raingarden” system such as the one shown below that was installed at Bundaberg. Similar installations have also been installed elsewhere in MBRC. The volumes of water involved at Benny Street might require some form of wetlands area to be created to make this work. However local Council officials have made it clear that no such alternative solutions will be considered.

Regardless of the final outcome, a thought should be given to the plight of residents and property owners along Boyd Street. Since 2009, they have lost their beach (although there was some rebuilding of that beach in the 2011 winter dune-building period). They have lost over 50 metres of dunes along with all the protective vegetation those dunes contained. All the protective salt-tolerant front vegetation on those dunes has been lost and the remaining vegetation is at risk as it is not salt-tolerant. The once vibrant bird population has disappeared because their habitat has been wiped out. And the amenity of their recreational area in the Boyd Street Erosion Control Area has been greatly compromised by the continual use of that area as a construction and storage site for works such as the Benny Street pipes, the storage of sandbags prior to their transport to other sites, and the storage of eroded vegetation prior to removal to a landfill. Some photos of these activities are shown below